Life sciences · Biotech · Pharma

NetSuite for biotech and pharmaceutical companies.

NetSuite can run a GxP-regulated biotech or pharmaceutical company when it’s implemented and validated for that use. BSP designs NetSuite around lot and expiration control, quality release, 21 CFR Part 11 electronic signatures and inventory held at CDMOs and 3PLs, then validates it with a risk-based package delivered as part of the implementation.

BSP is an Oracle NetSuite Solution Provider and Alliance Partner with 150+ life sciences implementations and ten applications built to run inside NetSuite.

Rows of glass vials casting long shadows

150+

Life sciences NetSuite implementations

10 Apps

Life sciences applications built to run inside NetSuite

8

Documents in BSP’s validation package

2026

NetSuite Alliance Spotlight Award · Life Sciences
A point of view

Most biotechs don’t make their own product. Their ERP still has to prove it was made right.

Drug substance at one CDMO, fill and finish at another, packaging and distribution at a 3PL. The work is outsourced; the accountability isn’t. When a regulator, a partner or a recall asks which lots went where, the answer has to come from your system, not from a chain of emails with your suppliers.

That changes what the ERP is for. It isn’t only books and purchase orders. It’s the record of what you own, where it sits, what state it’s in and who released it, across every partner that touches it.

WHAT AN OUTSOURCED MODEL ASKS OF THE ERP

01 INVENTORY AT CDMOs + 3PLs, BY LOT
02 QA RELEASE STATUS BEFORE ANY LOT SHIPS
03 EXPIRY-DRIVEN ALLOCATION (FEFO)
04 SUPPLIER + CDMO APPROVAL STATUS
05 COMPONENT-TO-FINISHED LOT GENEALOGY
06 PART 11 SIGNATURES ON QUALITY DECISIONS
07 CLINICAL + COMMERCIAL SUPPLY IN ONE SYSTEM
08 PUBLIC-COMPANY FINANCIAL CONTROLS

Requirement by requirement

How NetSuite meets biotech and pharma GMP requirements

Native NetSuite covers the financial, inventory, procurement and manufacturing core. The GMP controls come from how the account is configured and from BSP applications built on the platform. Here is where each requirement lives.

REQUIREMENTWHERE IT COMES FROMHOW IT’S HANDLED IN NETSUITE WITH BSP
Electronic records and signatures21 CFR Part 11BSP Electronic Signature on quality decisions, alongside NetSuite’s system audit trails and role-based access.
Lot identification21 CFR 211.80Distinct lot numbers from BSP Lot Generator, with validations that stop duplicate and previously used vendor lots at receipt.
Quarantine and QA release21 CFR 211.22 · 211.84Lot status control, automatic quarantine, quality inspection at receiving and shipment blocks for unreleased lots.
Expiration dating and stock rotation21 CFR 211.137 · 211.150Expiration dates carried by lot, assemblies dated from their components, and first-expiring, first-out allocation.
Supplier and CDMO qualification21 CFR 211.84BSP Approved Suppliers and vendor lot approval alerts, so unapproved sources can’t be received or used.
Batch records and genealogy21 CFR 211, Subpart JLot-level genealogy from component receipt through assembly to shipment, including inventory held at CDMOs and 3PLs.
Deviations, complaints and CAPA21 CFR 211.192 · 211.198The BSP eQMS Bundle links complaints and nonconformances to CAPAs and the affected lots.
Procedures and training21 CFR 211.25 · 211.100eQMS document control (DCO) and training, with retraining assigned when a controlled document changes.
Product tracingDSCSANetSuite holds the lot, expiry and transaction data; package-level serialization and data exchange usually run in a track-and-trace platform integrated with it.
Validation of the ERP itself21 CFR 211.68 · Part 11A risk-based validation package, scoped to GxP processes and delivered with the implementation (below).

References are to US cGMP for finished pharmaceuticals (21 CFR Part 211). Biologics, APIs and clinical supply carry additional requirements. Your quality team decides what applies; this table shows where each control lives in NetSuite.

Validation

How do you validate NetSuite in a GxP environment?

By risk, not by volume. Not every NetSuite process touches product quality, so the first step is deciding which ones do. GxP processes such as receiving, lot status, release, expiry and quality records get scripted testing and full traceability to requirements; non-GxP processes get lighter assurance. That approach matches ISPE’s GAMP 5 and the FDA’s risk-based Computer Software Assurance guidance.

BSP starts the GxP strategy in planning, not after the build, and delivers the validation package with the implementation: operational qualification before user acceptance and performance qualification, and a plan for assessing each NetSuite release against the GxP scope.

A RISK-BASED SOFTWARE VALIDATION PACKAGE

01 VALIDATION PROTOCOL
02 SOFTWARE REQUIREMENTS SPECIFICATION
03 NETWORK DIAGRAM
04 RISK ANALYSIS
05 21 CFR PART 11 COMPLIANCE ANALYSIS
06 TEST PLAN + TEST SPECIFICATIONS
07 REQUIREMENTS TRACEABILITY MATRIX
08 FINAL VALIDATION REPORT

Who we work with

From first GMP lot to public-company controls.

Biotech and pharma companies tend to call us at one of five moments. Each one changes what the implementation has to get right first.

GO DEEPER

Clinical stage, heading for launch

Moving off QuickBooks or a starter system before the first commercial or GMP lots need tracking, so traceability and validation are set up once rather than retrofitted.

Virtual pharma running on CDMOs

Drug substance, fill-finish and distribution outsourced, with inventory, lot status and release that still have to be visible and controlled in your own system.

CDMOs and contract manufacturers

Lot-controlled production for sponsors who audit you, with supplier, inspection and release records to match.

Public, or about to be

When the ERP has to satisfy SOX and investor reporting as well as GMP inspection, on one platform rather than two.

Already on NetSuite, but not validated for this

Live on NetSuite without the GxP scope, controls or documentation an auditor expects. We add them to the account you already have.

Customer story · Halozyme

A public biopharma, live on a GxP-validated NetSuite.

Halozyme needed an ERP that met two standards at once: the controls a public company expects of its financial systems, and the evidence a regulated manufacturer needs that the system works as intended. BSP set the GxP strategy in planning and carried it through the build, with lot control running on BSP’s own applications in production. Halozyme went live in mid-September 2026, with BSP’s team on site in San Diego through cutover week.

VALIDATION
GxP STRATEGY FROM PLANNING
VALIDATION PLAN, SRS, RISK ANALYSIS
PART 11 ANALYSIS + GxP / NON-GxP TEST SPLIT
OQ EXECUTED BEFORE UAT + PQ

LOT CONTROL
DUPLICATE + VENDOR LOT VALIDATION AT RECEIPT
ASSEMBLY EXPIRY FROM COMPONENTS
FIRST-EXPIRING, FIRST-OUT ALLOCATION

BSP SOLUTIONS IN PRODUCTION
LOT GENERATOR · QUALITY INSPECTION
APPROVED SUPPLIERS · ELECTRONIC SIGNATURE
ITEM REVISION

Frequently asked questions

Biotech and pharma NetSuite questions, answered.

Short answers to what quality, supply chain and finance leaders ask us first.

RELATED

Is NetSuite a good ERP for biotech and pharmaceutical companies?

Yes, for most companies from late clinical stage through commercial scale, including those that outsource manufacturing. NetSuite covers financials, inventory, procurement, manufacturing and multi-entity consolidation on one cloud platform. The GMP controls, such as lot status, QA release, expiry, supplier approval and Part 11 signatures, come from how it’s configured and from industry applications like BSP’s that run inside NetSuite.

Can NetSuite be used in a GxP environment?

Yes, when it’s validated for its intended use. No ERP is GxP-compliant on its own; compliance belongs to your quality system. NetSuite provides audit trails, role-based access and electronic records, and with BSP’s Electronic Signature application, a validated configuration and documented procedures, it supports Part 11 and cGMP record-keeping.

How do you validate NetSuite for GxP?

Risk-based. Define which processes are GxP, test those with scripts and traceability to requirements, and give the rest lighter assurance. BSP delivers a validation plan, software requirements specification, risk analysis, Part 11 analysis, test specifications, traceability matrix and final report, with operational qualification before user acceptance and performance qualification.

Can NetSuite track inventory held at a CDMO or 3PL?

Yes. Inventory you own at outside locations can be tracked by lot, expiry and status, so stock at a CDMO or 3PL stays visible and controlled. How receipts, consumption and shipments are recorded depends on the data your partners send, which is designed during implementation.

How does NetSuite handle expiration dating and FEFO?

Each lot carries its expiration date, assemblies can take their expiry from their components, and inventory can be allocated first-expiring, first-out. Lot status control and automatic quarantine stop expired or unreleased lots from shipping.

Does NetSuite handle DSCSA serialization?

Partly. NetSuite holds the lot, expiration and transaction data that DSCSA product identifiers depend on. Package-level serialization and electronic data exchange with trading partners usually run in a dedicated track-and-trace platform integrated with NetSuite. The last DSCSA exemption, for small dispensers, ends November 27, 2026.

When should a biotech move to NetSuite?

Ideally before the first commercial or GMP lots need tracking, usually between late clinical stage and launch. Moving then means traceability and validation are set up once, rather than retrofitted onto live product during a launch.

We’re already on NetSuite. Can BSP validate it?

Yes. We assess the account you run today, define the GxP scope, close the control gaps and produce the validation package against your current configuration. Operis then provides ongoing managed services, including release assessments.

Talk to someone who has written the validation plan before.

Heading for launch, outgrowing a starter system, or already live on NetSuite without the GxP scope you need: our life sciences team has done it before, and can show you the documentation to prove it.