Customer story · Medical device · Capsule endoscopy
Newly public, and built to be audited.
CapsoVision listed on Nasdaq in July 2025. Three months later it began moving its operations onto NetSuite with BSP, with two requirements it could not trade off: a system its auditors could rely on, and one it could validate as a medical device manufacturer. CapsoVision went live in July 2026, with serial, lot and expiration tracking on every build and validation running alongside the project from March.
CLIENT
CAPSOVISION, INC. · NASDAQ: CV
SECTOR
MEDICAL DEVICES · CAPSULE ENDOSCOPY
HEADQUARTERS
SARATOGA, CALIFORNIA
ENGAGEMENT
IMPLEMENTATION · VALIDATION SUPPORT · OPERIS
PLATFORM
NETSUITE · MANUFACTURING · ADVANCED REVENUE MANAGEMENT
GO-LIVE
JULY 2026
9 mo
From kickoff to go-live
3
Traceability attributes on every assembly build
4
Process areas with validation templates
3 wks
Of daily check-ins after go-live
The situation
Going public raises the bar on the back office.
CapsoVision, based in Saratoga, California, makes CapsoCam Plus, a wire-free capsule endoscope that captures a panoramic view of the small bowel. It is an FDA-cleared Class II device, and CapsoVision builds and ships it with contract manufacturing partners in its supply chain.
Listing on Nasdaq in July 2025 changed what the back office had to deliver. A public company’s records, approvals and access controls have to stand up to its auditors. A device manufacturer’s records have to stand up to its regulators: every unit traceable to the components and lots that went into it, and every system that touches quality validated for its intended use.
CapsoVision needed one ERP that could meet both standards, and a partner that understood why they are different.
Auditors want to know the records are right. Regulators want to know every device is traceable. A public medical device company needs one system that can answer both.
The standard
Validation
Validated alongside the build, not after it.
BSP started a dedicated validation workstream in late March 2026, while configuration and walkthroughs were still under way. A validation plan came first. BSP then built process validation templates for the areas a device manufacturer’s quality system depends on: warehouse transactions, items and inventory planning, manufacturing, and outsourced manufacturing.
In June, CapsoVision’s validation team worked through the test scenarios with BSP alongside, reviewing documentation and resolving feedback before cutover. BSP also built saved searches specifically to support validation evidence.
Approvals are part of the record too. BSP’s Electronic Signature solution was installed in March 2026 and configured in production for go-live, so receiving and fulfillment transactions carry a signed approval inside NetSuite, on the record being approved.
THE VALIDATION WORKSTREAM
01 VALIDATION KICKOFF · MARCH 2026
02 VALIDATION PLAN
03 PROCESS VALIDATION TEMPLATES
04 SCENARIO TESTING · JUNE 2026
05 ELECTRONIC SIGNATURE IN PRODUCTION
Because validation ran in parallel with the build, it was never the last thing standing between CapsoVision and go-live.
What went live
Traceability from the build up.
The project kicked off on October 7, 2025. Discovery covered fixed assets, order management, billing, returns and commissions, and walkthroughs and user acceptance testing followed through the spring.
Traceability got the closest attention. BSP configured serial number, lot number and expiration date on assembly builds, set up multi-level bills of materials for both in-house and outsourced manufacturing, and developed a custom import tool so serialized assembly builds can be loaded accurately at volume. Lot and serial trace reporting followed in production.
Cutover ran in the first weeks of July 2026, with daily go-live calls while open transactions, inventory and opening balances were loaded and reconciled.
Manufacturing and traceability
Assemblies and multi-level bills of materials, outsourced manufacturing, serial, lot and expiration tracking on builds, and lot and serial trace.
Revenue and finance
Advanced Revenue Management for bundled kit sales with automated arrangement dates, fixed assets with lease accounting, commissions, and Bill Capture for vendor bills.
Supply chain and tax
Landed cost, Ship Central for shipping and its mobile app, and Avalara for sales tax.
Quality and approvals
BSP Electronic Signature and process validation templates.
The outcome
Live in July, then tuned.
CapsoVision went live in early July 2026 on one platform for manufacturing, inventory, revenue and finance, with traceability and signed approvals built into the transactions themselves.
BSP held daily check-ins with the CapsoVision team for the first three weeks, then kept going: fixed asset and landed cost data were brought in, the assembly build import tool moved through testing, and lot and serial trace was configured in production in August.
Go-live was a milestone, not the finish line
Since July 2026, BSP has delivered:
01 POST-GO-LIVE STABILIZATION
02 ASSEMBLY BUILD IMPORT TOOL
03 LOT & SERIAL TRACE IN PRODUCTION
04 PDF FORM CUSTOMIZATION
05 OPERIS ESSENTIALS · SEPTEMBER 2026
After go-live
Keeping it audit-ready.
CapsoVision moved to Operis Essentials, BSP’s managed services program, in September 2026. The first month began with Business Discovery: a review of user roles and permissions, a finance business discovery audit run against production, and documentation of how the system is built.
A team that knows the record
A validated, public-company system has to stay that way as NetSuite updates and the business changes. Operis gives CapsoVision a team that already knows the configuration, the validation work and the controls behind it.
Newly public, or getting ready?
Regulated companies in the public markets don’t get to choose between audit-ready and validated. Start with a partner who builds for both.